Automatic punching machine preparation
In order to make better use of modern machinery and equipment, and to play its due function, we have a full preparation for the time-division requirements of the active drilling machine, especially before the start-up:
1. Is the screw loose?
2. Whether the drill pipe and the drill bit are damaged
3. Is the hole frame cracked?
4. Is the equipment of the spray in place?
Automatic drilling machine operation method:
1. At the beginning of the operation, stop and remove the protective cover
2. When the machine is working, non-workers should stay away from the machine.
3. The machine should be cleaned and kept clean at the end of the operation.
