Operating procedures for automatic die-cutting machines, safety operating standards for die-cutting machines

Mar 25, 2021

Leave a message

Standards that need to be paid attention to before starting the die cutting machine


1) Check the handover records to understand the operation of the equipment


2) In accordance with the production scheduling plan, check the quantity of die-cutting and the quality of the product according to the requirements of the production construction order.


3) After checking and confirming that there is no foreign matter on the machine, perform a thorough inspection and adjustment of the machine.


4) Check whether the die cutting is the same size as the box sample


5) Check if the product has a grip


6) Choose bottom template material according to product quantity, paper type and carton structure


7) Install the die-cut plate and lock the fastening screws to prevent the die-cut plate from loosening. Make the bottom template, the thickness of the bottom mold is the thickness of the die-cut product paper


8) Install the bottom template, clean the surface debris and lock it tightly


9) Adjust the die-cutting pressure according to the thickness of the paper. When adjusting, the pressure should be gradually increased from light to heavy to 80% penetration, otherwise it will cause equipment damage


10) Adjust the position of the upper and lower thimble of the paper ejection part, and lock it


11) After adjusting the various parts, check the box sample to request the production sample, check that there is no quality problem, and the supervisor can sign the sample and the normal production can be done.


2. Standards and standards that need to be paid attention to in the production of die cutting machines


1) Operate according to the production requirements of the construction order and the standard of signing samples.


2) During the production process, a sampling inspection is performed every 5-10 minutes, and quality problems are reported in time, and production can be continued after resolution.


3) After each version of die-cutting, a comprehensive inspection must be performed and the "Die-cutting Process Sheet" must be filled in. If there is a quality problem, the products should be separated in time, and the "Abnormal Product Flow Sheet" should be filled in.


4) If material problems are found, production should be stopped, and the "Feedback Form for Poor Quality of Production Materials" should be filled in, so that relevant departments can coordinate and solve them to prepare for subsequent production.


3. Specifications and standards that need to be paid attention to after the production of the die-cutting machine


1) The captain should fill in the "Moving and Cutting Daily Report", "Statistical Table of Process Quality Status" and "Daily Inspection of Production Equipment" every day.


2) Separate the die-cut products into qualified and inferior products, and clearly identify them.


3) At the end of production, the equipment should stop at the mold opening position.


4) Maintain the equipment according to the daily maintenance content.


5) Fill in the shift record carefully.


6) Turn off the power.